|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Price lists open in a new window |
|
|
|

Download Adobe Reader |
|
|
|
Download & Print This Information
|
|
|
|
|
Do not remove the PEACEMAKER® from the pallet.
Place the entire assembly on a firm base. |
|
|
Remove and
save the cap from the foul-air intake. Install air
damper if required, and connect into malodor source. |
|
|
Connect
exhaust stack. (If scrubber is in
an enclosed building, continue stack through wall or
roof.) |
|
|
Install fan and connect it to the electrical power according to specifications
and your local regulations. Switch on. |
|
|
Remove
and save the plug from the condensate drain located
near the intake fitting. |
|

|
|
|
|
© 1994-2007 Syneco Systems, Inc. All Rights Reserved.
|
|
|